EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
DaveBellairs
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (652)
Research
Workshop
- (4)
Empennage
- (14)
Fuselage
- (54)
-
Vans reply to front...
-
Final installed side...
-
Subpanel rib and...
-
Reinstalled the...
-
Baggage floor pan
-
Flap position sensor...
-
More nutplates
-
More seat pan nutplates
-
Seat pan nutplates
-
Baggage and seat pans
-
Elevator pushrods
-
Sam installed nutplates
-
Baggage area nutplates
-
Torqued rudder pedal...
-
Subpanel mod
-
Subpanel riveting
-
Wire chafing...
-
Brake lines
-
Brake lines
-
Rudder pedals
-
Rudder pedal anti...
-
Rudder pedal paint
-
Rudder pedals
-
Right Seat back
-
Completed SL-00014...
-
SL-00014 tail brace
-
SL-00014 tail brace
-
Modified subpanel
-
Park brake valve
-
Canopy fairing
-
More canopy fairing...
-
Brake lines
-
Canopy glued on
-
More tip up skin pics
-
Clamped cabin frame...
-
Tip up skin
-
Drilling out lots of...
-
Aft fuse rudder...
-
Photo of fuse
-
Cabin frame
-
Cabin frame assembly
-
Cabin frame angles
-
Cabin frame assembly
-
Cabin frame splice...
-
Cabin frame paint
-
Jdair rudder stop
-
Elevator upstop
-
Antisplat vertical...
-
Cabin frame
-
Trimming longeron...
-
More Wing mating
-
Wing mate prep
-
Temporary wing bolt...
-
Wing mating prep
Firewall
- (78)
Tail Feathers
- (40)
Wings
- (105)
Controls
- (6)
Avionics
- (149)
Lighting
- (13)
Instrument Panel
- (9)
Landing Gear
- (4)
Engine
- (159)
Propeller
- (1)
Fuel System
- (7)
Interior Finish
- (3)
Paint / Decals
- (6)
Inspection
Tools
Builder Name:
Dave Bellairs
-
Project:
Vans - RV-7
-
VIEW REPORTS
Total Hours:
1460.9
Total Flight Time:
Start/Last Date:
Jun 24, 2017 - No Finish Date
Engine:
Lycoming IO-360
Propeller:
Whirlwind 200RV
Panel:
Advanced Flight Systems Avionics
Friendly URL:
https://eaabuilderslog.org?s=DaveBellairs
Home or Last Project Picture
Mar 17, 2023
Rudder pedals
- (3 hours)
Category: Fuselage
Installed remaining rudder pedals and secured all castle nuts with cotter keys. Installed entire assembly into the fuselage. Very tight fit with NACA ducts and hinge pin tubing installed.
462E50D5-797A-4650-81E3-CB0BA26F5857.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.